Period
Main data: General Planning of a 50 MW / 100 MWh Battery Energy Storage systems and cable connections: The project aim is to develop and install a battery storage power plant in the Westnetz GmbH distribution grid at the high-voltage and medium-voltage level. The system should be designed as 2h systems and participate in the energy trading market and the balancing market by providing system services.

 

 

Consultancy Services

Services provided:

  • Basic Design
  • Detailed Design
  • Preparation of Tender Documents
  • Site Supervision
  • Commissioning