Transmission and Distribution

220 kV Transmission Line Gaita-Nyakanazi

Details
Client
Country
Tanzania
Location
Period
Capacity:

  • Construction of a new 220 kV double circuit transmission line from Geita to Nyakanazi 140 km
  • Extension of the 220/33 kV substation in Geita
  • Construction of a new 220/33 kV substation in Nyakanazi
  • Construction of a new 220 kV double circuit transmission line from Geita to Nyakanazi 140 km
  • Rural electrification system for the clusters Geita-Bwanga and Nyakanazi-Kakonko
Services provided:

  • Project Management
  • Data collection & Site investigations
  • Line routing and design of 220 kV substations and overhead lines
  • Analyses by means of a geographical information system (ArcGIS)
  • MV/LV survey works and design
  • Preparation of Tender documents
  • Resettlement Action Plan
  • Site Supervision