Power & Heat

4 GW Hydrogen

Details
Client
Country
Egypt
Location
Period

Lahmeyer International successfully supported the Client to submit a Feasibility Study to sign FWA with Egyptian authorities in the frame of COP27.  The Feasibility Study was further elaborated for final submission.

Capacity:

  • 2 x 200 MW pilot projects (for ammonia/e-methanol production)
  • 4 GW targeted total capacity

 

Feasibility study

Services provided:

  • Concept screening and basic design of PV, Wind, electrolysis, NH3/CH3OH plants & storage
  • Optimization of the value chain nodes and the power supply configuration
  • TIC and development cost estimation & financial analysis
  • Development of the project execution plan
Themen

More References

Mehr laden