Laúca Hydropower Project

Details
Client
Country
Angola
Location
Kwanza River
Period
Capacity: 2,910,000 m3 RCC dam Total installed capacity 2.070 MW 6 x 340 MW in underground powerhouse (6+1) Francis turbines

Services provided:

  • Advisory services to the main works
  • Review of feasibility studies (2010) and basic design
  • Technical assistance (during tendering processes)
  • Project implementation on EPC base
  • Construction design approval (civil + E&M)
  • Supervision of construction works and equipment installation
  • Factory inspections
  • Commissioning + initial operation