Power & Heat

New Plant Cottbus

Details
Client
Country
Germany
Location
Cottbus
Period

Fuel cell buses are to be used in Cottbus in the future. Lahmeyer is investigating the economic feasibility of a hydrogen production plant including a filling station. The electrolysis plant is to be built on the site of Deutsche Bahn’s future new maintenance center for high-speed trains.

Capacity: H2 production for 46 buses

 

Feasibility Study

Services provided:

  • Clarification of the task based on the client’s requirements planning
  • Determining the planning boundary conditions and advising on the overall performance requirements
  • Optimizing the conceptual system configuration according to technical and economic criteria with the Tractebel “Prosumer” software
  • Determining the investment and operating costs
  • Cost-benefit analysis
Themen

More References

Mehr laden