Hydro

Rehabilitation Hydroelectric Power Plant Trebinje 1 – Phase III

Details
Client
Country
Bosnia and Herzegovina
Location
Period
Capacity: 163.5 W
Technical Data:
3 x 54.5 MW Francis turbine, net head 86.5 m, 3 x 70 m³/s, 1.3 billion m³ storage volume of Bileca reservoir
Services provided:

  • Specification of physical works and services with drafting of inquiries to testing institutes
  • Evaluation of the test results and preparation of an Investigation Report incl. recommended rehabilitation concept
  • Elaboration of tender documents (incl. ECA), bid evaluation;
  • Assistance in tendering and negotiation of supply contracts
Themen

More References

Mehr laden