Hydro

Rehabilitation of Hydro Power Plant Rama

Details
Client
Country
Bosnia and Herzegovina
Location
Period
Capacity: 200 MW
Technical Data:

  • 2 x 100 MW Francis turbine generating units, design head 285 m, 2 x 111 MVA synchronous generator, headrace tunnel inner diameter 5 m, length 9.5 km
Services provided:

  • Preparation of tender documents
  • Bid Evaluation and assistance in equipment procurement
  • Approval of contractor’s design and factory acceptance tests,
  • Witness turbine model test
  • Site supervision of erection and commissioning