Hydro

Rehabilitation of Perućica Hydro Power Plant 

Details
Client
Country
Montenegro
Location
Period
Capacity: 307 MW (potential upgrade to 365.5 MW)
Technical Data:

  • Embarkment dams, 16.5 to 22.5 m height, length 1.5 to 2.35 km
  • Surface powerhouse, Pelton turbine type, 5 generating units each 38MW, 2 generating units each 58.5 MW and future 8th unit (58.5MW), rated head 526 m
Services provided:

  • Review of existing feasibility designs and tender design/documents for plant modernization
  • Identification of physical rehabilitation works for of the power plant
  • Tender documents for modelling and testing of equipment and civil structures, supervision of execution
  • Program for rehabilitation and preparation of financial/economic analyses