Transmission and Distribution

Synchronization of WAPP Interconnected System

Details
Client
Country
Benin
Location
Period
Capacity:

  • Static and Dynamic Analysis of the WAPP interconnection network
  • Static VAr Compensators in 3 Substations (2 in Niger and 1 in Senegal)
  • Installation of PMUs in 24 substations across 9 different West African countries and integration into the existing WAMS system
Services provided:

  • Upgrade of Protection, Control and SPS (Special Protection Scheme) in various substations in the entire network
  • Tender documents, evaluation and selection of contractors
  • Assistance during Contract Negotiations and award of contracts
  • Project management
  • Review and approval of design documents
  • Supervision of construction and commissioning
  • Assistance during the warranty