Renewables

UAE government funded program to install and operate hybrid wind and solar plant

Details
Client
Country
United Arab Emirates
Location
Sir Bani Yas Island, Delma Island, Sila and Al Hala
Period
Capacity:

  • Total capacity 103.5MW
  • 23 Goldwind 155 Turbines
  • 14MWp single-axis tracking solar PV plant

 

Owner’s Engineer

Services provided:

  • Wind Farm Planning for the four pilot wind farm sites, including execution of topographical and geotechnical studies
  • Preparation of Tender Documents and support during the tender phase, comprising assistance in bid clarifications, tender evaluation and assistance during contract negotiations
  • Preparation and execution of a wind measurement campaign for a period of minimum 12 months, comprising a LIDAR measurement and four wind measurement masts of 100 m height each
  • Support during the extension planning of the wind measurement sites towards commercial scale wind farm sites
Themen

More References

Mehr laden